| Alcan |
|
•
The uplifting of primary rock from beach, haulage and
deposition adjacent to the works.
• The uplifting of primary rock from the existing
revetment, haulage and deposition adjacent to the works.
• Bulk excavations, haulage, and deposition of suitable
fill on site and compacted where necessary.
• Placed both primary and secondary rock to form new
revetment.
• Placement of geotextile. |

Click image to view on map |
| |
Lambton |

Click image to view on map |
• Clearing trees, bushes and redundant fencing above existing
ground level using a combination of mechanical plant and
operatives using chain saws.
• Logging larger trees into suitable sections for disposal as
necessary.
• Preparing access points through existing embankment. |
| Howick Quarry |
|
• Excavation of topsoil, haulage and deposition infill areas and
temporary stockpiles.
• Excavation of subsoil, haulage and deposition infill areas.
• Bulk excavation, haulage, deposition as fill on site.
• Rip and stone pick subsoil and topsoil.
• Grass seeding. |
|
| |
Hadson Industrial Estate |
|
|
• The stripping of
topsoil, haulage and deposition in stockpiles on site.
• Bulk excavation, haulage, deposition in stockpiles on
site.
• The importation placing and compaction of capping
material and sub base. |
| Heights
Quarry |
|
• The stripping of topsoil, haulage and deposition in
dump.
• Bulk excavation, haulage, deposition as fill on site.
• Excavation of 56,000m³ of topsoil and overburden. |
|
| |
2006 – Mootlaw Quarry |
|
• The stripping of
topsoil and haulage to existing topsoil dump.
• Excavation of subsoil and haulage to existing subsoil
dump.
• Bulk excavation and haulage to restoration area.
• Rip and stone pick soil areas.
• Fencing works to northern boundary and regarding area. |
| West
Auckland Bypass |
|
•
Clear site of redundant fencing, hedging, shrubs and
small trees.
• Topsoil strip adjacent to existing stream.
• Form stockpiles of topsoil.
• Excavation of a temporary watercourse.
• Import various suitable stone fill material onto site
which was spread in 150mm layers and compacted.
• Initially construct 4.0m road to fill depth of 0.5m.
• Terram laid on top of topsoil prior to introduction of
any store fill. |
|
| |
Lumley Brick Works |
|
Enablement Contracts
• Reclamation of a derelict brick work site.
• Re-levelling surface of adjacent old open cast site.
• 16,000m³ topsoil stripping.
• Compact cut fill 12,000m³
• Demolition of structural concrete bases and old
chimney.
• Crushing of hard material of 6F2 specification.
• Compacted to house building standards. |
| Purvis
Timber Yard, Walkergate |
|
Enablement Contract
• Clearance of large quantities of fly tipping.
• Breaking out of old concrete slabs & foundations.
• Cut & fill, & dispose of contaminated material off
site.
• Site made to house building standards. |
|
| |
Scorton Quarry |
|
• Excavation of
32,000m³ of topsoil, subsoil, clay & waste products and
replace as restoration material. |
| The
Spinney – Easington |
|
•
Stripped area in preparation for wall construction.
• Prepared 91m of concrete foundations.
• Constructed wall to Maccaferri design.
• Laid 150mm perforated pipe at rear of wall by hand.
• Progressively filled with suitable aggregate in the
grading range 75-125mm.
• Cribs are filled to 1m backfill comprising of 75mm
down graded 6F5 Stone in 100mm layers at rear of wall. |
|
| |
Ashington – NCB Workshops |
|
• Excavation of a
mixture of clay and black shale on line of previous
stanchion bases and stockpile for re-use.
• Excavation of clay to a depth of 29.3 AOD haul to
stockpile.
• Excavation of previously stockpiled materials and
deposited in prepared excavations in layers of 250mm
thick and compacted as detailed within the works
schedule.
• Removal of any artificial hard materials during
excavations.
• Processing of hard materials to 6F5. |
| Lambton
– Phase 3 |
|
•
Excavation of former Cokeworks foundations.
• Processing of excavated hard material.
• Part construction of development platform.
• Part construction of central route to foundation
level.
• Part construction of landscape mound west of central
route. |
|
| |
A688 Wheatley Hill Bypass |
|
• Coal extraction and
backfilling.
• Earthworks to Byers Garth roundabout.
• Earthworks to Coxhoe roundabout.
• Earthworks adjacent to existing live carriageways.
• Importation and placement of GSB Type 1. |
| Thirsk
Slurry Ponds |
|
•
Topsoil strip of the field and deposition in dump.
• Bulk excavation haulage and deposition to embankments
to form lagoon together with compaction.
• Spread topsoil on outside face of embankment. |
|
| |
Dawdon Industrial Estate |
|
• Bulk excavation and
haulage off site existing dump.
• Maintaining road in clean conditions. |
|
Lintzhall Farm, Burnopfield |
|
•
Topsoil strip of the field and deposition in dump.
• Bulk cut to fill to form plateau together with
compaction.
• Supplied, spread and compacted 6F5 stone 200mm thick.
• Excavation of topsoil from stockpile and spread on
batters. |
|
| |
Castle Eden |
|
• Cleared watercourses
of trees, branches and debris.
• Supplied and installed ‘Living Wall’ gabion baskets.
• Regraded bankside.
• Reconstructed footpath in the damaged area. |
|
Gillbrook School |
|
•
Bulk excavation of existing dump, haulage and deposition
as suitable fill on site of old school buildings.
• Bulk excavation for attenuation tanks, haulage and
deposition as suitable fill/temporary dump as directed. |
|
| |
Northumbria Business Park |
|
• Bulk excavation of
existing dump, haulage and deposition as suitable fill
on the area stripped of soil.
• Topsoil strip on new development area and deposition
in dump.
• Bulk excavation haulage and deposition to temporary
dump as directed. |
|
Houghton Quarry |
|
| •
Excavation of 120,000m³ of overburden & placing into
stockpiles on site. |
|
| |
East Hetton |
|
This was a land
reclamation contract and consisted of the excavation and
filling of 1.2 million cubic metres of colliery shale,
200,000m³ of subsoil & 70,000m³ of topsoil. We also
installed a drainage system and constructed 12,000m² of
bridleway and an HDPE lined reed bed. |
|
Easington Colliery |
|
Land Reclamation
• Removal of 300,00m³ of contaminated and uncontaminated
colliery spoil from the cliff and beach area.
• Processed contaminated material.
• Fill area was encapsulated with 70,000m² of Bentomat
covered with 800m of clay and 200m of subsoil.
• Importation of 40,000m³ of subsoil & 30,000m³ of
topsoil.
• Full area seeded. |
|
| |
Pickering Nook |
|
Enablement Contract
• Removal of shallow worked coal seams.
• Excavation and double handling of 250,000m³ of
material.
• Removal of 30,000 tonnes of coal.
• Site had to be compacted to house building standards. |
| Dawdon
Colliery |
|
|
Land reclamation scheme involving breaking out buried
foundations and structures. Excavation and filling of
400,000m³ of topsoil, subsoil and general material,
processing of unacceptable material, crushing of
concrete to 6F2 specification, grass seeding and
construction of 2,000m of bridlepaths. |
|
| |
A1 Climbing Bradbury to
Bowburn |
|
• Spoil arising from
installation of drainage system hauled & stockpiled.
• Drainage trenches in filled with selected suitable
material.
• Layers not exceeding 150mm of capping using tarmac
planings.
• Layers of sub-base were spread not exceeding 150mm
depth. |
| Chilton
Bypass |
|
•
Site clearance to remove of redundant fencing, hedging,
shrubs and small trees.
• Excavation of topsoil from road corridor hauled and
stockpiled.
• Bulk excavation, materials hauled to suitable fill
areas and compacted.
• Suitable fill areas were spread in layers and
compacted.
• 6F2 were spread in 150mm layers and compacted. |
|
| |
Northside, Birtley |
|
• Excavation of
materials from the existing stockpiles, loaded into road
wagons and disposed of offsite.
• Stripped topsoil and stockpiled for reuse on site.
• Excavation of existing material, deposited as suitable
fill on site and compacted.
• Excavation of existing materials and loaded into road
wagons for disposal off site.
• Breakout rock.
• Processed rock into 6F2 for reuse on site. |
| A689
Crook Bypass |
|
•
Excavation of materials and stockpiled for reuse.
• All clean clay arising from works were stockpiled.
• 650mm depth below sub formation were excavated and
recompacted.
• 200mm of the above were clay which was stockpiled to
ensure that the marginally contaminated material was
sealed below a capping layer.
• Two layers of Bastex Geogrid were placed at right
angles to each other to improve their load carrying
properties.
|
|
| |
Mootlaw Quarry |
|
• Excavation of
approximately 100,000m³ of overburden & placed into
restoration areas including double handling – 1996.
• Excavation of 200,000m³ of topsoil, subsoil
overburden. Formation of a new silt lagoon – 1999. |
| Seaton
Meadows |
|
•
Excavation of existing ground and hauled to stockpile.
• Exposed of existing engineered clay.
• Graded formation
• Obtained clay from stockpile or excavations to
construct new clay liner between existing cells.
• Formed clay bunds.
• Laid geotextile to new clay liner.
• Provided drainage aggregate material onto geotextile.
• Graded drainage aggregate layer. |
|
| |
Alnwick |
|
• The stripping of
topsoil, haulage and deposition in temporary stockpiles.
• Bulk excavation, haulage, deposition in temporary
stockpiles and as suitable fill on site and compact.
• The importation and placing of capping material and
sub-base.
• The re-excavation of topsoil from stockpiles and
deposition. |
| Ebchester Quarry |
|
| • Excavation of
topsoil, subsoil an overburden. |
|
|